VaultISO 27001ISO 27001 Annex A 8.10: information deletion that survives audit
ISO 27001 · A.8.10

ISO 27001 Annex A 8.10: information deletion that survives audit

Information deletion

Harry WestFounder & CEO26 June 202312 min read
Inside This Article
What does ISO 27001:2022 Annex A 8.10 information deletion require?How do you design an ISO 27001 information deletion policy and retention schedule?Which media sanitisation methods count as deleting through forensically sound methods as part of C&D?How do you delete cloud data and media you cannot physically reach?How do you handle backups and right-to-erasure requests under A.8.10?Where does data hide after you delete the master copy?How do you automate information deletion end to end?What audit evidence does Annex A 8.10 need?What will auditors test under ISO 27001 Annex A 8.10?Frequently asked questions
Book a discovery call

Key takeaways

Annex A 8.10 asks you to erase information when its purpose and retention period end, using methods that survive forensic recovery, and to prove it happened. A retention schedule keyed to your data inventory, cloud lifecycle rules, crypto-shredding and filed certificates turn the control into evidence rather than assertion. Auditors sample a departed customer, a disposed asset and your live console.

Scope
Covers erasing information from live systems, cloud services and media once its purpose ends. New in the 2022 revision; physical disposal of equipment sits in a separate control, A.7.14.
Retention schedule
One schedule keyed to the data inventory records each information type's retention period, the event that starts the clock and the named owner of the deletion decision.
Sanitisation
Match the method to the medium: recognised overwriting for drives, factory reset for phones, crypto-shredding for cloud data and certified destruction for end-of-life media. The recycle bin only hides data.
Audit evidence
Auditors trace a departed customer's data to confirmed erasure, match a destruction certificate to a specific asset and check lifecycle rules in the live cloud console.

A customer's termination notice arrives with one line that matters: delete our data within 30 days, and certify it. You have a retention policy somewhere, a recycle bin, and no record that anything was ever erased.

This guide covers ISO 27001 Annex A 8.10 for security officers, IT leads and compliance managers at UK-regulated firms and B2B SaaS companies. It moves deletion out of manual checklists and into cloud lifecycle rules, event-driven erasure and sanitisation you can evidence.

What does ISO 27001:2022 Annex A 8.10 information deletion require?

ISO 27001 2022 Annex A 8.10 information deletion requires you to erase information once its purpose and retention period end. The method must survive forensic recovery, and you keep records proving the erasure happened. The control is new in the 2022 revision and covers logical deletion; equipment disposal sits in A.7.14.

In practice the control asks for four things, in order:

  1. Know when information stops being needed. The retention schedule sets the date.
  2. Erase it so it cannot be recovered. The method depends on the medium.
  3. Chase down the stragglers. Old versions, caches, temporary files and supplier copies.
  4. Keep the proof. A log, report or certificate shows the erasure happened.

Annex A 8.10 handles the logical side of disposal. Its physical twin, A.7.14, covers wiping and destroying the equipment itself, and A.5.33 guards the opposite flank: the records you are obliged to keep. Retiring a server touches both 8.10 and A.7.14, so write one procedure that hands off cleanly between them.

Data that no longer exists cannot be breached, demanded in litigation or fined over. Deletion is the last step in handling information, and classification is the first.

UK GDPR's storage-limitation principle and the right to erasure make over-retention a regulatory exposure whether or not you certify. A breach investigation that surfaces ten-year-old customer records you had no reason to hold turns a bad week into a fine. Enterprise buyers also write deletion commitments like the one in that termination notice into contracts. A firm that cannot evidence deletion cannot sign them honestly.

Over-retention is not caution. Every record kept past its purpose is attack surface you pay to defend and get nothing back from.

How do you design an ISO 27001 information deletion policy and retention schedule?

Write one retention and disposal schedule anchored to your data inventory (A.5.9). For each information type, record how long it lives, which event starts the clock — contract end, account closure, employee departure — and who owns the decision. UK GDPR's storage-limitation principle expects documented retention periods, so the schedule serves both regimes.

The ICO guidance on the storage limitation principle asks for a policy that sets standard retention periods wherever possible, and for regular reviews of the data you hold. A schedule that lives only in someone's head fails that test, and it fails the audit too.

Build it in four moves:

  1. Start from the inventory. List every information type in the A.5.9 inventory; without it, the schedule is guesswork. Classification then tells you how sensitive each type is, which later drives the erasure method.
  2. Set the period. Record the legal or contractual baseline for each type, and the business purpose behind anything kept longer.
  3. Name the clock-start event. Use an event, not a calendar date, so an HR or CRM change can trigger deletion automatically later.
  4. Assign an owner. One named role decides exceptions and signs off what gets erased.

The usual failure is a schedule written once for the audit and never revisited, quietly out of step with current legal and contractual obligations. Put a review date on the document, and let a change in a customer contract or a regulator's expectation reopen it.

A retention schedule nobody has ever watched fire is a wish list.

Which media sanitisation methods count as deleting through forensically sound methods as part of C&D?

NIST SP 800-88 defines media sanitisation as rendering access to target data infeasible for a given level of effort, through Clear, Purge or Destroy techniques. Match the technique to the medium and sensitivity: the recycle bin only hides data, while recognised overwriting, factory resets and certified destruction remove it.

The NIST SP 800-88 Rev. 2 media sanitisation guidelines, which replaced Rev. 1 in September 2025, are the reference auditors recognise, so naming them in your procedure saves an argument. The test is outcome-based: recovery must be infeasible for a given level of effort. Your job is to pick the technique that meets that bar for each medium you hold.

Choose in three steps:

  1. Identify the medium. Laptop and server drives, phones, removable media, paper and cloud storage each need a different route.
  2. Set the method by sensitivity. The more sensitive the information, the stronger the technique, up to destruction for end-of-life media.
  3. Capture the result. A sanitisation-tool report or a certificate of destruction is what turns the act into evidence.

Two pitfalls cause most findings. The first is treating the recycle bin as deletion. Recoverable data on a "wiped" machine is one of the most avoidable audit findings and breach causes. The second is hardware donated, sold or returned to a lessor with its storage intact.

Solid-state drives need their own route. Wear-levelling leaves copies in cells that overwriting software cannot reach, so use the drive's built-in secure erase or sanitise command, or a cryptographic erase if the drive encrypts itself.

Pull the drives before kit goes back to a lessor or a vendor for repair. Treat any journey to a sanitisation site as part of the chain, with the asset logged out and logged in again.

MethodBest suited toWhat it doesEvidence it leaves
Recycle bin or simple deleteNothing; housekeeping onlyHides data from view; a recovery tool brings it backNothing worth filing
Recognised overwrite (NIST 800-88 approach)Laptop and server drives you will reuse or returnRemoves data from the drive itselfSanitisation-tool output report
Factory resetPhones and tabletsReturns the device to a clean state before reuse or returnTicket noting the reset against the asset
Crypto-shreddingCloud storage and media you cannot reachMakes ciphertext unreadable everywhere, backups includedKey-destruction log
Certified destructionEnd-of-life mediaRemoves the data by destroying the mediumCertificate of destruction filed against the asset
Free Resource - ISO 27001

The ISO 27001 readiness checklist

Ninety-eight controls mapped to what an assessor actually asks for, in the order they ask it. Written by practitioners who took our ISMS through certification.

AvailablePDF21 pages
  • how to define your ISMS scope
  • the risk-assessment and treatment evidence trail,
  • your Statement of Applicability and residual-risk positions, and
  • the supplier, access-control, and operational-evidence questions most teams miss.

DOC-27001-CHK · v2.4

We'll use your details to give you access to the resource you requested, plus occasional related content. Opt out any time — see our Privacy Notice.

How do you delete cloud data and media you cannot physically reach?

Use the provider's deletion mechanisms and lifecycle automation, such as object lifecycle rules, then add crypto-shredding where you cannot reach physical media. Destroying the encryption keys makes the data unreadable wherever those keys protect it, backups included. Provider attestation reports cover the rest, standing in for direct observation of their hardware.

Cloud deletion is engineered, not witnessed. Nobody on your team will watch a provider wipe a drive in its data centre. The control shifts to setting up the platform correctly and keeping the evidence it produces.

Layer three mechanisms:

  • Provider deletion. Delete through the service's own console or API, and keep the log of the call.
  • Lifecycle rules. Object lifecycle rules in cloud storage, retention policies in Microsoft 365 or Google Workspace, and TTL or scheduled purge jobs on databases. Each one expires data on schedule without anyone having to remember.
  • Crypto-shredding. Encrypt with keys you control and destroy the keys when retention ends.

Crypto-shredding is only as precise as your key design. One key for the whole estate means you can destroy everything or nothing. A key per customer or dataset lets you erase one tenant's data when its contract ends. Record each key destruction in your key-management log.

File the provider's current attestation report with your supplier review. Then the answer to "how do you know the provider erased it?" is a document, not a shrug.

How do you handle backups and right-to-erasure requests under A.8.10?

Erase from live systems promptly, let backup copies expire on their normal rotation, and suppress the record if a restore happens in between. The ICO's right-to-erasure guidance says to put backup data 'beyond use' even when it cannot be immediately overwritten. Write the position down as policy before a request arrives.

The ICO guidance on the right to erasure and backup systems is the anchor. Its point is that you must not use the backed-up data while it waits to be overwritten in line with an established retention schedule. Erasure does not mean rewriting every cyclic or immutable backup.

A defensible written position has four parts:

  1. Erase live. Remove the data from production systems, databases and SaaS tools promptly, and log the deletion.
  2. State the backup cycle. Record how long backups are kept, so the age-out date of any copy is knowable.
  3. Suppress on restore. Keep a list of erased individuals and reapply it after any restore, before the system returns to service.
  4. Record the request. Note the date received, the systems touched and the date backups will have aged out.

Auditors and the ICO both accept a reasoned position more readily than one made up on the spot.

Where does data hide after you delete the master copy?

Superseded document versions, caches and temporary files, personal drives, and copies held by processors and sub-processors all outlive the master record. Sweep each one deliberately, and write deletion obligations, during the contract and at exit, into supplier agreements, collecting the supplier's confirmation when they erase.

Treat the sweep as a checklist of places, each with its own mechanism:

  • Superseded versions. Set version-history retention in your document stores so old drafts age out with the record.
  • Caches and temporary files. Application caches, export folders and temp directories need scheduled clean-up jobs, because nobody deletes them by hand.
  • Personal drives. Apply retention policies to individual drives and downloads, and clear them at offboarding.
  • Processors and sub-processors. Ask each supplier holding your data how and when it erases, and who confirms it.

Supplier clauses do two jobs. During the contract, they oblige the supplier to delete on your instruction or when retention ends. At exit, they oblige it to erase everything and confirm in writing, and that confirmation is the artefact you file.

The classic miss is deleting the master record while versions, caches and duplicates live on untouched. A customer export sitting on a shared drive is still the customer's data, and a breach investigation will find it.

How do you automate information deletion end to end?

Treat retention as configuration. Lifecycle rules in cloud storage and workspace suites run continuously once set against the schedule. Add offboarding-triggered erasure workflows, a deletion-due dashboard that joins the schedule to the data inventory, and tightly restricted bulk-deletion rights protected by MFA and logging.

Deletion automates unusually well because the platforms enforce it natively. Four builds cover the control:

  1. Rules kept as code. Define lifecycle and retention rules in version-controlled configuration rather than console clicks. Every change is then reviewed, and the history shows the rules matched the schedule all year.
  2. Event-driven erasure. An offboarding record in the HR system, or a termination flag in the CRM, starts the deletion workflow for that person's or client's data. The workflow writes its completion record back automatically.
  3. A deletion-due dashboard. The schedule held as data and joined to the inventory yields a queue of what is due and what is overdue. An annual guilt-driven purge becomes weekly housekeeping.
  4. Restricted bulk deletion. Limit the right to a few hands, put MFA in front of it and log every use with the approver visible.

A bulk-delete permission with no approver and no log is an incident waiting for a typo.

Log deletions of sensitive data as well. If information later surfaces where it should not, the deletion record is how you prove what you destroyed and when.

Scale the machinery to the firm. A 30-person SaaS company does not need enterprise records-management software. Workspace retention policies and a one-page schedule usually cover it, and the platforms you already pay for carry the rest.

What audit evidence does Annex A 8.10 need?

Auditors read the retention schedule and the data inventory together. Then they look for proof that deletion ran: lifecycle rules configured in the live console, purge logs, bulk-deletion logs with the approver visible, sanitisation-tool reports, and disposal-vendor certificates of destruction filed against the specific assets they cover.

File each artefact where an auditor can find it without a scavenger hunt:

  • Schedule and inventory: the policy library, reviewed together, with a visible review date.
  • Lifecycle configuration: console exports or screenshots, ideally shown live rather than described.
  • Purge and bulk-deletion logs: the logging platform, with approvers named.
  • Sanitisation reports: attached to the asset's ticket or record.
  • Certificates of destruction: attached to the asset they cover.
  • Supplier clauses and confirmations: the supplier register, with attestation reports for the major clouds.

Certificate chasing can run itself. Open each asset disposal as a ticket and keep it open until the destruction certificate is attached, so the evidence gap closes before anyone asks.

The pitfall is using a disposal vendor and never collecting or filing the certificates. The work happened, the evidence didn't, and an auditor can only grade what is on the table.

What will auditors test under ISO 27001 Annex A 8.10?

Expect the auditor to pick a departed customer or employee and trace their data to confirmed erasure. They will ask for the destruction certificate for a specific disposed asset, and open your cloud console to check the lifecycle rules exist. Missing schedules or recoverable disposed hardware grade major; isolated gaps grade minor, or major as a pattern.

Questions to rehearse before the room:

  • How do you know when a customer record is due for deletion? Walk through the trigger.
  • A client terminated last quarter. Show their data being deleted and the evidence you kept.
  • What happens to the drive in a laptop returning off lease?
  • How do old versions, caches and temporary files get caught?
  • What happens in your backups when someone invokes the right to erasure?
  • Who can mass-delete data, and what stops them doing it by accident?

A schedule that promises "deleted after 6 years" invites the follow-up: show me something that hit 6 years and went. Have one real example ready, with the log beside it.

In certification-body practice, grading follows a pattern:

  • Major: no retention schedule at all, or disposed hardware leaving with recoverable data on it.
  • Minor: a missing destruction certificate, one system without lifecycle rules, or a schedule that has drifted from current legal requirements.
  • Escalation: minors that repeat across the sample, or sampling that shows deletion simply never happens, aggregate to major.

Frequently asked questions

Not as a standalone control. The 2013 control set dealt with disposing of media and equipment, not with erasing records from live systems and cloud services when retention ends. A disposal procedure carried over from 2013 covers only part of 8.10, and the retention schedule is usually the missing piece.

Usually the senior IT lead runs the tooling and the disposal vendors. Whoever owns privacy compliance sets the retention rules those tools enforce. In a 25-person firm both hats may sit on one person. In that case, make a second person the approver for bulk deletions so the separation still shows in the logs.

A.5.33 protects the records you are obliged to keep, while A.8.10 erases what you no longer need. They meet at the retention schedule. The legal or contractual retention requirement sets the earliest date a record may go, and the deletion process takes over from there.

The retention schedule is a few days of workshop effort, and the automation pass takes another one to two weeks. The long pole is usually the data inventory. If you do not yet know what you hold or where it lives, the schedule has nothing to attach to, so finish that first.

Profile image for Harry West, Founder and CEO of GRCMANA
Author

Harry West

Harry is the founder of GRCMANA, he helps regulated service providers close the enterprise trust gap — turning GRC, cyber resilience and AI governance from paperwork exercises into shippable systems.

Standard engine

ISO 27001 reference directory.

Every control in this framework and the clause guides that sit above them, grouped by control domain. Open any entry for its control definition, implementation steps and the audit evidence it expects. Dimmed entries are planned.

ClausesThe management systemClause guides · 23 guides
Clause 4.1Understanding the organization and its context→Clause 4.2Understanding the needs and expectations of interested parties→Clause 4.3Determining the scope of the information security management system→Clause 4.4Information security management system→Clause 5.1Leadership and commitment→Clause 5.2Policy→Clause 5.3Organizational roles, responsibilities and authorities→Clause 6.1Actions to address risks and opportunities→Clause 6.2Information security objectives and planning to achieve them→Clause 7.1Resources→Clause 7.2Competence→Clause 7.3Awareness→Clause 7.4Communication→Clause 7.5Documented information→Clause 8.1Operational planning and control→Clause 8.2Information security risk assessment→Clause 8.3Information security risk treatment→Clause 9.1Monitoring, measurement, analysis and evaluation→Clause 9.2Internal audit→Clause 9.2Preparing for Your ISO 27001 Stage 2 Audit: A Practical Checklist→Clause 9.3Management review→Clause 10.1Continual improvement→Clause 10.2Nonconformity and corrective action→
A.5Organizational Controls37 guides
A.5.1Policies for information security→A.5.2Information security roles and responsibilities→A.5.3Segregation of duties→A.5.4Management responsibilities→A.5.5Contact with authorities→A.5.6Contact with special interest groups→A.5.7Threat intelligence→A.5.8Information security in project management→A.5.9Inventory of information and other associated assets→A.5.10Acceptable use of information and other associated assets→A.5.11Return of assets→A.5.12Classification of information→A.5.13Labelling of information→A.5.14Information transfer→A.5.15Access control→A.5.16Identity management→A.5.17Authentication information→A.5.18Access rights→A.5.19Information security in supplier relationships→A.5.20Addressing information security within supplier agreements→A.5.21Managing information security in the ICT supply chain→A.5.22Monitoring, review and change management of supplier services→A.5.23Information security for use of cloud services→A.5.24Information security incident management planning and preparation→A.5.25Assessment and decision on information security events→A.5.26Response to information security incidents→A.5.27Learning from information security incidents→A.5.28Collection of evidence→A.5.29Information security during disruption→A.5.30ICT readiness for business continuity→A.5.31Legal, statutory, regulatory and contractual requirements→A.5.32Intellectual property rights→A.5.33Protection of records→A.5.34Privacy and protection of PII→A.5.35Independent review of information security→A.5.36Compliance with policies, rules and standards for information security→A.5.37Documented operating procedures→
A.6People Controls8 guides
A.6.1Screening→A.6.2Terms and conditions of employment→A.6.3Information security awareness, education and training→A.6.4Disciplinary process→A.6.5Responsibilities after termination or change of employment→A.6.6Confidentiality or non-disclosure agreements→A.6.7Remote working→A.6.8Information security event reporting→
A.7Physical Controls14 guides
A.7.1Physical security perimeters→A.7.2Physical entry→A.7.3Securing offices, rooms and facilities→A.7.4Physical security monitoring→A.7.5Protecting against physical and environmental threats→A.7.6Working in secure areas→A.7.7Clear desk and clear screen→A.7.8Equipment siting and protection→A.7.9Security of assets off-premises→A.7.10Storage media→A.7.11Supporting utilities→A.7.12Cabling security→A.7.13Equipment maintenance→A.7.14Secure disposal or re-use of equipment→
A.8Technological Controls34 guides
A.8.1User endpoint devices→A.8.2Privileged access rights→A.8.3Information access restriction→A.8.4Access to source code→A.8.5Secure authentication→A.8.6Capacity management→A.8.7Protection against malware→A.8.8Management of technical vulnerabilities→A.8.9Configuration management→A.8.10Information deletion→A.8.11Data masking→A.8.12Data leakage prevention→A.8.13Information backup→A.8.14Redundancy of information processing facilities→A.8.15Logging→A.8.16Monitoring activities→A.8.17Clock synchronization→A.8.18Use of privileged utility programs→A.8.19Installation of software on operational systems→A.8.20Networks security→A.8.21Security of network services→A.8.22Segregation of networks→A.8.23Web filtering→A.8.24Use of cryptography→A.8.25Secure development life cycle→A.8.26Application security requirements→A.8.27Secure system architecture and engineering principles→A.8.28Secure coding→A.8.29Security testing in development and acceptance→A.8.30Outsourced development→A.8.31Separation of development, test and production environments→A.8.32Change management→A.8.33Test information→A.8.34Protection of information systems during audit testing→
OtherAdditional Guides7 guides
GuideISO 27001 Statement of Applicability: what it is, with a worked example→GuideISO 27001 implementation→GuideISO 27001 certification and audit process→GuideISO 27001 mandatory documents and records→GuideISO 27001 gap analysis→GuideISO 27001 certification cost→GuideISO 27001 Annex A controls→
ISO 27001 Accelerator

Ready to accelerate your path to certification?

Work with a Trust Architect to scope your ISMS, close the gaps, and get audit-ready — without stalling your roadmap.

Book a Call →
GRCMANA
  • About
  • Insights
  • Contact
Ask the Trust ArchitectBook a Call →
  • About
  • Insights
  • The Vault
    Compliance VaultCyber Essentials→ISO 27001→SOC 2→ISO 42001→
    Domain VaultGRC Fundamentals→Risk Management→AI Governance→GRC Engineering→
    Other ResourcesFree Tools→Templates→Newsletter→
  • Contact
Book a Call →Ask the Trust ArchitectFixed fee. ISO 27001 in as few as six weeks.
GRCMANA

Helping high-growth B2B tech startups close the Enterprise Trust Gap through security, governance, and AI resilience.

ISO 27001ISO 42001ISO 9001Cyber EssentialsEU AI Act ReadyNIST AI RMF

The Vault

GRC EngineeringAI GovernanceISO 27001ISO 42001All Vault Resources

Resources

BlogFree ToolsTemplatesNewsletter

Company

About GRCMANAContactPrivacy PolicyTerms & ConditionsCookie Policy
© 2025 GRCMANA · All rights reservedRegistered in England & Wales under company registration 16810805. VAT Registration 506308024