Equipment maintenance
Annex A 7.13 has two faces: keeping equipment and supporting plant serviced on a schedule, and controlling the people and channels that perform maintenance. A cloud-first firm still maintains a short, mostly non-IT list. A simple log, run as service-desk workflow, is the control and the audit evidence.
The due-diligence questionnaire asks when your UPS batteries were last replaced and who escorted the engineer who serviced them. Nobody can say, and the certification date slips. This guide to ISO 27001 Annex A 7.13 is for UK regulated service providers and B2B SaaS firms: what the control asks for, how to scope it when you run in the cloud, and the evidence an auditor will read.
It is written for security managers and IT leads who need a working programme in days, not a policy library. You will leave with a short in-scope list, a supervision routine, a remote-access pattern and a way to let your service desk produce the evidence.
ISO 27001 Annex A 7.13 requires equipment to be maintained so it keeps its security promises, and requires that maintenance itself be controlled. It has two faces: reliability, meaning serviced kit and supporting plant on a schedule with records; and trust, meaning authorised, supervised maintainers, controlled remote access and inspected returns.
The control treats maintenance as a security-sensitive moment, not housekeeping. The engineer with a screwdriver inside your rack can see what is stored there and could alter what runs. Neglect does the same damage more quietly, through the plant nobody owns.
Each face breaks into practices that later sections take in turn:
The control is preventive. Planned servicing heads off failure, and the controls around maintainers head off compromise, so neither waits for damage to show. All three security properties are in play: availability for kit that dies from neglect, confidentiality for what a technician can see or take, and integrity for what they could alter or implant.
Two neighbours share the border. Equipment leaving for repair also falls under Annex A 7.9 on off-site assets, and equipment that maintenance condemns exits through Annex A 7.14 on secure disposal. Auditors use ISO 27001 Annex A equipment maintenance as a quick probe of operational ownership: either someone can produce the service schedule or nobody can.
A cloud-first firm still maintains a short, mostly non-IT list: UPS units and batteries, comms-room cooling, alarms and detectors, extinguishers, office network kit and laptops under warranty. Your cloud provider maintains its data centres, not your comms cupboard. In serviced offices, map which plant the landlord maintains and hold their evidence on file.
Cloud hosting shrinks the list rather than deleting it. A warranty laptop, the switch in the comms cupboard and the extinguisher by the door still age, fail and need a record. The failures that hurt are unglamorous: cooling that cooked the comms room over a bank holiday, or a UPS whose ageing batteries lasted seconds into an outage. "We never maintained it" is a poor sentence in a post-incident report.
For a firm of around 50 people, the inventory usually reads like this:
Put each item on a schedule driven by the manufacturer's guidance and by how much it would hurt if it failed. Then read your insurance schedule: insurers write maintenance conditions into policies, usually for fire systems and electrical inspection, and claims teams check them. Fold those dates into the same calendar.
This control is about physical equipment and the people who touch it. Software patching and vulnerability management sit in other Annex A controls, so keep them off this calendar and it stays short.
The landlord split is usually clean: the building's systems are theirs, while the UPS under your rack and your own alarm contract are yours. Map it once and file their maintenance confirmations, because their servicing counts for you only if you hold the evidence.
Start the list with the plant, because the servers depend on it.
Treat every visiting engineer as a physical access event. Use named, authorised suppliers with contracts and NDAs in place before the first visit, sign engineers in, escort and supervise them near racks, patch panels and stored records, and inspect the equipment afterwards for interference. Supervision is not rudeness; it is the control.
Engineer visits borrow the visitor process you already run for physical entry under Annex A 7.2, with extra care near racks and records. Because servicing is scheduled, every visit can be planned and recorded in advance.
An engineer left alone in the server room is an access-control bypass in a hi-vis vest.
A workable routine for each visit:
Escorting feels rude to some teams, so engineers wander unescorted and a service visit turns into an access finding. Give reception a standard line that the rule applies to every visitor. Repaired kit plugged straight back into production has the same flaw: tampering or misconfiguration then surfaces through an incident rather than a checklist.
Keep vendor remote access closed by default and open it per session with approval, MFA, least privilege, a defined window and a session log. Before data-bearing hardware leaves for repair, back it up, confirm full-disk encryption or pull the drive, and ship it tracked with a chain-of-custody note.
A standing, always-on vendor tunnel is the classic quiet hole in an otherwise tidy estate. NIST SP 800-53 Rev. 5 Control MA-4 (Nonlocal Maintenance) expects remote maintenance to be approved and monitored, with strong authentication, detailed records and termination when the session ends. The NCSC Guidance on Third-Party Risks to Operational Technology adds that a third party should reach only the assets specified, and warns that connectivity you have not mapped, such as undisclosed out-of-band channels, can leave you carrying substantial unmanaged risk.
A session runs in five steps:
Shared accounts, missing MFA and sessions nobody logs or reviews are the usual failure pattern. Each step above removes one of them, and the ticket keeps the proof.
Data-bearing kit crosses the Annex A 7.9 boundary the moment it leaves. The NCSC Guidance on Secure Sanitisation and Disposal of Storage Media names returning a faulty device to the vendor for repair as one of the moments its sanitisation advice applies. It also notes that on devices encrypted with BitLocker or FileVault, deleting the keys makes the data unreadable.
Run this checklist before dispatch:
A laptop shipped with a cleartext disk is a data breach in waiting. If the data is sensitive and none of the protections are possible, a new drive and a destroyed old one is often the economical answer.
No. At this scale, a maintenance schedule, a simple log and a line in your Statement of Applicability or IT procedures stating who maintains what is a complete answer. Auditors ask for evidence of servicing, not a freestanding policy document, so spend the effort on the calendar and the log.
Standing the programme up takes a day or two: inventory, calendar and supplier paperwork. After that it runs on its own rhythm. Build it alongside the rest of the physical family, once the physical security perimeters under Annex A 7.1 are defined.
The minimum set is four things:
A maintenance programme with no log isn't a control. It's an assertion.
Work that happens with nothing written down becomes a shrug at audit and a "the IT guy handles it". Write the log entry when the engineer leaves, while the details are fresh. A few minutes per job is the whole cost.
The evidence pack centres on the maintenance log and the schedule it executes, backed by service-desk work orders, visitor and escort records, supplier NDAs and contracts, physical service stickers on extinguishers and UPS units, remote-session authorisations and logs, and custody notes with tracked-shipping records for off-site repairs.
Each artefact proves one thing:
Assemble the pack per asset, not per document type. For the UPS, hold the schedule line, the last log entry, the ticket and a photo of the sticker together, so a single trace answers the auditor's first question.
Auditors trace a couple of assets from schedule to log to sticker, cross-check one engineer visit against the visitor book and supplier contract, and probe remote routes for MFA and session records. Under certification-body norms, a missing programme or a standing unauthenticated remote channel grades major; lapsed servicing, a missing NDA or an uninspected return grades minor.
Questions to expect in the room:
On the walk-round the auditor physically reads the extinguisher and UPS tags, so out-of-date stickers surface fast. The follow-through question is a favourite: a fault logged in March, with no entry showing it was fixed.
A fault logged but never closed out is an audit finding waiting for its question.
Unsupervised third-party access to areas holding sensitive data also grades major, because it is the absence of the requirement rather than a lapse in it. Minor lapses aggregate to major when they form a pattern, so remove the pattern rather than patching single records.
Run the trace yourself a month before the audit: two assets, one engineer visit, one remote route, one repair. Every gap you find is a finding you did not receive.
Turn the control into workflow: recurring service-desk tickets replace the diary, comms-room sensors and UPS self-tests raise tickets before outages, vendor accounts expire by design, and off-site repair tickets refuse to close without backup, encryption and return-inspection evidence. The closed ticket becomes the log entry, so evidence accrues as the work happens.
Four mappings do the work:
The human layer shrinks to judgement: who approves a vendor window, whether a battery reading justifies early replacement, what the inspection note says. Everything else is routine the service desk runs.
At this scale, one dashboard answers both the auditor and the enterprise customer's security questionnaire, so evidence stops being a scramble before each review.
| Task | Manual routine | Service-desk workflow | Evidence it produces |
|---|---|---|---|
| Planned servicing | Diary reminder and a spreadsheet | Recurring ticket per asset, closed with findings | Closed ticket as the log entry |
| Comms-room conditions | Someone notices the heat | Sensor and UPS self-test alerts raise tickets | Alert history and ticket trail |
| Vendor remote access | Standing account | Account enabled by approval with an end time | Approval and session log in one ticket |
| Off-site repair | Email and a courier slip | Ticket that will not close without backup, encryption check, tracking and inspection | Custody trail and inspection note |
Treat it as mandatory in practice, because it is the artefact every auditor asks for and the only way to show servicing was planned rather than improvised. A spreadsheet is enough at small scale. If you have no history, start the log from today and attach invoices or service certificates for earlier work rather than reconstructing entries.
Yes, once you rely on them for work. The case to plan for is the warranty swap, where the vendor replaces the device and keeps the faulty one, so its drive never comes back. Encrypt or remove the drive before dispatch, record the swap in the log and update the asset register with the replacement's serial number.
Annex A 7.9 protects the asset while it is away from your premises, and A.7.13 governs the repair itself. One ticket can serve both: record who holds the device, where it is and when it is due back. A repair that overruns its return date is the trigger to chase the repairer and, if the disk was not encrypted, to assess whether data is at risk.
It leaves through secure disposal under Annex A 7.14. Before it goes, record the fault and the decision to condemn in the maintenance log, update the asset register and confirm any storage media is sanitised or destroyed. Keep the disposal certificate with the log entry so the equipment's history closes in one place.
Yes, and a missed date can complicate a claim. Ask your broker for the conditions in writing rather than relying on memory of the policy, copy every date into the calendar and file the inspection certificate against each entry. Settle the question before an incident, not during a claim.
Every control in this framework and the clause guides that sit above them, grouped by control domain. Open any entry for its control definition, implementation steps and the audit evidence it expects. Dimmed entries are planned.
Work with a Trust Architect to scope your ISMS, close the gaps, and get audit-ready — without stalling your roadmap.